HOW WE WORK QUALITY CONTROL & PACKAGING

Agree acceptance details
before products ship.

Quality checks, tests and packaging depend on the sign type and project specification. The acceptance points, records and packing approach should be agreed with Bendo for each order.

Request a Quote
PROJECT COORDINATION

What this stage covers.

Specification review

Align the inspection criteria with approved drawings, finishes, sign dimensions and project requirements.

Product checks

Confirm which appearance, assembly, lighting or other checks apply to the products in the order.

Testing requirements

Discuss any required aging, waterproof or other tests before production; test availability and scope require project confirmation.

Packing plan

Confirm protective packing, labeling, shipment grouping and handling needs for the delivery destination.

NEXT STEP

Bendo’s available quality, environmental, occupational health and safety, enterprise qualification and production safety documents can be reviewed online.

View Certifications
DISCUSS YOUR PROJECT

Let’s confirm the right scope.

Share the application, location, drawings and timing you have.

Request a Quote
Inquiry