Project overview
Wayfinding in a shopping centre has to work for a visitor seeing the building for the first time.
We produced the directory totems with interchangeable tenant strips, so the mall can update shop names without rebuilding the sign. Light boxes were built with slim aluminium profiles and even LED spacing to avoid bright spots on the printed graphic.
Because the mall was trading, each sign was designed to fit a service lift and assembled on site from numbered parts.
Scope of work
- 01
Mall fascia and entrance light boxes
- 02
Hanging directional signs
- 03
Floor standing directory totems
- 04
Directory and wayfinding signs
- 05
Promotional light boxes for tenants
Project considerations
The mall had to stay open during installation, so all large signs were produced in modules that could be carried through service lifts and assembled at night.
Delivered for the site
Around 120 signs were delivered in three batches matching the fit-out schedule, with no interruption to trading hours.
Related products
Frequently asked questions
Our MOQ is typically 1 piece for custom signage. We welcome both small and large orders.
Standard lead time is 7-15 days for production. Shipping time varies by destination.
Yes, we ship to over 50 countries worldwide. Contact us for a shipping quote.
We offer a 1-year warranty on all products covering manufacturing defects.
Absolutely! We specialize in custom signage. Send us your design files and we'll provide a quote.
Yes, we provide professional installation services for projects in China. For international projects, we offer guidance and support.



